E0715 over STEELY SPRING CREEK

4.2N 3E OF TAHLEQUAH · County 021, Oklahoma · Built 2003 · 2 Lanes · 221 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
274880000000000
Year Built
2003
Length
15.9 m (52.2 ft)
Max Span
4.6 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
221
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.