E1370 over CREEK

3S 1.2W OF U.S. 62 · County 015, Oklahoma · Built 2001 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 5 Fair

Location

35.028892, -98.255481

This bridge is in worse condition than 59.1% of bridges in County 015. The average bridge in Oklahoma is 0 years old; this one is 25 years old.

Nearby Bridges

Bridge Details

Structure #
269350000000000
Year Built
2001
Length
13.7 m (44.9 ft)
Max Span
13.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000
Total Project Cost
$331,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.