N3460 over CREEK

3N 2E .7N OF SH18/SH105 · County 081, Oklahoma · Built 2001 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
268090000000000
Year Built
2001
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$168,000
Total Project Cost
$266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.