IRR E0022 over FIVE MILE CREEK

7.5 E OF PITCHER · County 115, Oklahoma · Built 2004 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
265450000000000
Year Built
2004
Length
48 m (157.5 ft)
Max Span
15.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$883,000
Total Project Cost
$1,402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.