E0601(8 TH ST.W) over CREEK
8TH STR. W OF INDUSTRIAL · County 143, Oklahoma · Built 1999 · 2 Lanes · 130 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
36.145853, -96.119867
This bridge is in worse condition than 83.3% of bridges in County 143. The average bridge in Oklahoma is 0 years old; this one is 27 years old.
Nearby Bridges
E0605 (4TH ST.) over CREEK
Built 1938
E0605 over CREEK
Built 1930
U.S. 64 EB over S.H. 97 UNDER
Built 1968
U.S. 64 WB over 97TH W AVE. UNDER
Built 1968
U.S. 64 WB over S.H. 97 UNDER
Built 1968
U.S. 64 EB over 97TH W AVE. UNDER
Built 1968
U.S. 64 WB over MAIN ST. UNDER
Built 1968
U.S. 64 EB over MAIN ST. UNDER
Built 1968
129TH W. AVE. over U.S. 64 UNDER
Built 1968
U.S. 64 EB over LINCOLN AVE RAMP UNDER
Built 1968
Bridge Details
- Structure #
- 264660000000000
- Year Built
- 1999
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $168,000
- Total Project Cost
- $266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.