U.S. 77 NB over NW 78TH ST.(WILSHIRE UND

1.5N OF I-44 · County 109, Oklahoma · Built 2003 · 4 Lanes · 48,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
262210000000000
Year Built
2003
Length
80 m (262.5 ft)
Max Span
30.5 m
Width
23.2 m (76.1 ft)
Lanes
4
Daily Traffic
48,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,916,000
Total Project Cost
$5,364,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.