U.S. 169 NB over CANEY RIVER

1.5 MI N JCT SH 20 · County 131, Oklahoma · Built 1997 · 2 Lanes · 4,950 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
252460000000000
Year Built
1997
Length
214 m (702.1 ft)
Max Span
30.5 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
4,950
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,540,000
Total Project Cost
$4,311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.