2682C over LAFLIN CREEK

4 E 3.5 MI N ALEX · County 051, Oklahoma · Built 1999 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

34.961931, -97.7058

This bridge is in worse condition than 24.2% of bridges in County 051. The average bridge in Oklahoma is 0 years old; this one is 27 years old.

Nearby Bridges

Bridge Details

Structure #
252140000000000
Year Built
1999
Length
30.8 m (101 ft)
Max Span
30 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$320,000
Total Project Cost
$511,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.