3902C over BRAZIL CREEK
2.5 MI N OF RED OAK · County 077, Oklahoma · Built 1995 · 2 Lanes · 150 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
34.986508, -95.094928
This bridge is in worse condition than 42.7% of bridges in County 077. The average bridge in Oklahoma is 0 years old; this one is 31 years old.
Nearby Bridges
S.H. 82 over TURKEY CREEK
Built 1984
E1395 over CREEK
Built 2000
3902C over ROCK CREEK
Built 2004
E1395 over CREEK
Built 1998
3902C over CREEK
Built 1945
S.H. 82 over BRAZIL CREEK OFLOW
Built 1979
S.H. 82 over BRAZIL CREEK OFLOW
Built 1979
S.H. 82 over CREEK
Built 1979
S.H. 82 over BRAZIL CREEK
Built 1979
N4465 over RED OAK CREEK
Built 2014
Bridge Details
- Structure #
- 245530000000000
- Year Built
- 1995
- Length
- 23.7 m (77.8 ft)
- Max Span
- 22.9 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $277,000
- Total Project Cost
- $442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.