MC 73-36C over COAL CREEK

6.3 M N @ .5 E \ SH51&TPK · County 145, Oklahoma · Built 1996 · 2 Lanes · 80 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 6 Satisfactory

Location

36.043122, -95.583192

This bridge is in worse condition than 70% of bridges in County 145. The average bridge in Oklahoma is 0 years old; this one is 30 years old.

Nearby Bridges

Bridge Details

Structure #
244210000000000
Year Built
1996
Length
25.3 m (83 ft)
Max Span
24.4 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
80
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$286,000
Total Project Cost
$457,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.