N2370 over WASHITA RIVER

3.5 S. 2.7 W. OF COWDEN · County 149, Oklahoma · Built 1995 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 8 Very Good

Location

35.175214, -98.683614

This bridge is in worse condition than 24.7% of bridges in County 149. The average bridge in Oklahoma is 0 years old; this one is 31 years old.

Nearby Bridges

Bridge Details

Structure #
243600000000000
Year Built
1995
Length
55.5 m (182.1 ft)
Max Span
29.9 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$437,000
Total Project Cost
$680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.