I-40 EB AND RAMP over RENO ST-R.R.-RIVER UNDER

E. EDGE FT. SMITH JCT · County 109, Oklahoma · Built 1995 · 3 Lanes · 43,650 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
242710000000000
Year Built
1995
Length
277.4 m (910.1 ft)
Max Span
30.5 m
Width
21.6 m (70.9 ft)
Lanes
3
Daily Traffic
43,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,299,000
Total Project Cost
$14,580,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.