N2660 over CREEK

3. E 4.2 S OF GEARY · County 017, Oklahoma · Built 1993 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
238640000000000
Year Built
1993
Length
16.9 m (55.4 ft)
Max Span
16.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.