U.S. 75 over CEDAR CREEK

10.7 MI N SH3 · County 029, Oklahoma · Built 1994 · 2 Lanes · 1,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
237760000000000
Year Built
1994
Length
40.2 m (131.9 ft)
Max Span
15.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
1,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$604,000
Total Project Cost
$1,692,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.