2006C over BEAVER CREEK

1.0 S 1.4 W OF SUNSET · County 039, Oklahoma · Built 1994 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

35.739833, -98.992492

This bridge is in worse condition than 21.4% of bridges in County 039. The average bridge in Oklahoma is 0 years old; this one is 32 years old.

Nearby Bridges

Bridge Details

Structure #
237670000000000
Year Built
1994
Length
9.1 m (29.9 ft)
Max Span
7.6 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
200
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$168,000
Total Project Cost
$266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.