IRR 1682C over POST OAK CREEK

5.5 MI S 3.3 W CACHE · County 031, Oklahoma · Built 1992 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

34.545747, -98.685672

This bridge is in worse condition than 38.2% of bridges in County 031. The average bridge in Oklahoma is 0 years old; this one is 34 years old.

Nearby Bridges

Bridge Details

Structure #
230510000000000
Year Built
1992
Length
81.7 m (268 ft)
Max Span
30.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$536,000
Total Project Cost
$839,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.