CHEROKEE TP WB RMP over U.S. 59 / U.S. 412A UND

17.35 MI E OF C/L · County 041, Oklahoma · Built 1991 · 1 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
229350000000000
Year Built
1991
Length
103.3 m (338.9 ft)
Max Span
32.3 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
1,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$795,000
Total Project Cost
$1,628,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.