E1730 over CREEK

.8 E 11.2 S OF GOULD · County 057, Oklahoma · Built 1989 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

34.507081, -99.759828

This bridge is in worse condition than 62.3% of bridges in County 057. The average bridge in Oklahoma is 0 years old; this one is 37 years old.

Nearby Bridges

Bridge Details

Structure #
223320000000000
Year Built
1989
Length
35.1 m (115.2 ft)
Max Span
13.7 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$344,000
Total Project Cost
$550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.