S.H. 66 over DOSIE CREEK

11.1 MI E JCT SH 18 · County 081, Oklahoma · Built 1988 · 2 Lanes · 2,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
219580000000000
Year Built
1988
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
2,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$507,000
Total Project Cost
$1,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.