3336C over SANDY CREEK
1.4 S .4 W ELDORADO · County 065, Oklahoma · Built 1988 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.452675, -99.656044
This bridge is in worse condition than 37.8% of bridges in County 065. The average bridge in Oklahoma is 0 years old; this one is 38 years old.
Nearby Bridges
Bridge Details
- Structure #
- 219360000000000
- Year Built
- 1988
- Length
- 23.5 m (77.1 ft)
- Max Span
- 22.3 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $273,000
- Total Project Cost
- $436,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.