3336C over SANDY CREEK

1.4 S .4 W ELDORADO · County 065, Oklahoma · Built 1988 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

34.452675, -99.656044

This bridge is in worse condition than 37.8% of bridges in County 065. The average bridge in Oklahoma is 0 years old; this one is 38 years old.

Nearby Bridges

Bridge Details

Structure #
219360000000000
Year Built
1988
Length
23.5 m (77.1 ft)
Max Span
22.3 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$273,000
Total Project Cost
$436,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.