S.H. 59B over CREEK

2.7 MI E SH 102 · County 125, Oklahoma · Built 1988 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

35.145294, -97.005161

This bridge is in worse condition than 34.1% of bridges in County 125. The average bridge in Oklahoma is 0 years old; this one is 38 years old.

Nearby Bridges

Bridge Details

Structure #
219270000000000
Year Built
1988
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$431,000
Total Project Cost
$1,208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.