E2017 over SUGAR CREEK

3.7 N 1.6 W OF SOPER · County 023, Oklahoma · Built 1988 · 1 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 4 Poor

Location

34.098464, -95.723567

This bridge is in worse condition than 98.1% of bridges in County 023. The average bridge in Oklahoma is 0 years old; this one is 38 years old.

Nearby Bridges

Bridge Details

Structure #
218300000000000
Year Built
1988
Length
9.1 m (29.9 ft)
Max Span
8.7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
100
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$168,000
Total Project Cost
$265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.