I-35 over S. CANADIAN RIVER
CLEVELAND-MCCLAIN C/L · County 027, Oklahoma · Built 1986 · 3 Lanes · 34,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.193083, -97.485422
This bridge is in worse condition than 91.7% of bridges in County 027. The average bridge in Oklahoma is 0 years old; this one is 40 years old.
Nearby Bridges
I-35 over S. CANADIAN RIVER
Built 1988
I-35 over S. CANADIAN OFLOW
Built 1988
I-35 over S. CANADIAN OFLOW
Built 1988
S.H. 9 E over I-35 UNDER
Built 2015
S.H. 9E TO I-35 NB over I-35 NB TO LINDSEY UNDER
Built 2017
S.H. 9E TO I-35SB over I-35 SB TO S.H. 9E UNDER
Built 2017
LINDSEY TO I-35 SB over I-35 SB RMP TO SH 9E UND
Built 2017
I-35 SB RAMP S.H.9 over S. CANADIAN OFLOW
Built 2006
LINDSEY STREET over I-35 UNDER
Built 2017
S.H. 9 over I-35 UNDER
Built 2010
Bridge Details
- Structure #
- 213610000000000
- Year Built
- 1986
- Reconstructed
- 2013
- Length
- 1140 m (3740.2 ft)
- Max Span
- 30.5 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 3
- Daily Traffic
- 34,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $20,473,000
- Total Project Cost
- $26,387,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.