I-35 over S. CANADIAN RIVER

CLEVELAND-MCCLAIN C/L · County 027, Oklahoma · Built 1986 · 3 Lanes · 34,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
213610000000000
Year Built
1986
Reconstructed
2013
Length
1140 m (3740.2 ft)
Max Span
30.5 m
Width
20.7 m (67.9 ft)
Lanes
3
Daily Traffic
34,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,473,000
Total Project Cost
$26,387,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.