U.S. 75 SB over CANEY RIVER OFLOW

5.9 MI S JCT US 60 · County 147, Oklahoma · Built 1986 · 2 Lanes · 6,950 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
213170000000000
Year Built
1986
Length
45.7 m (149.9 ft)
Max Span
15.2 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
6,950
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$641,000
Total Project Cost
$1,794,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.