E0685 over POLECAT CREEK

.5W 1N .8W OF MILTON · County 037, Oklahoma · Built 1985 · 2 Lanes · 750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
211140000000000
Year Built
1985
Length
79.2 m (259.8 ft)
Max Span
25.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$528,000
Total Project Cost
$825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.