E1710 over FOBB CREEK

2.6E OF DAISY · County 005, Oklahoma · Built 1985 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 5 Fair

Location

34.5359, -95.694908

This bridge is in worse condition than 86.2% of bridges in County 005. The average bridge in Oklahoma is 0 years old; this one is 41 years old.

Nearby Bridges

Bridge Details

Structure #
209980000000000
Year Built
1985
Length
16.9 m (55.4 ft)
Max Span
16.2 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$232,000
Total Project Cost
$369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.