6116C over SCIPIO CREEK
2.3 N .5 E OF SCIPIO · County 121, Oklahoma · Built 1984 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
35.085233, -95.948247
This bridge is in worse condition than 83% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 42 years old.
Nearby Bridges
6116C over CREEK
Built 1995
6116C over GIN POND CREEK
Built 2001
6118C over CREEK
Built 2001
3210C over CREEK
Built 1947
E1350 over CREEK
Built 1939
N3950 over SCIPIO CREEK
Built 1987
6120C over CREEK
Built 1933
6116C over SCIPIO CREEK
Built 1982
N3950 over CREEK
Built 2003
CO. RD. 6118C over IND. NATION TP UNDER
Built 1975
Bridge Details
- Structure #
- 207870000000000
- Year Built
- 1984
- Length
- 28.7 m (94.2 ft)
- Max Span
- 9.1 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $308,000
- Total Project Cost
- $492,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.