4167C over SPRING CREEK

4.1 E 1.9S OF PARKLAND · County 081, Oklahoma · Built 1984 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
207840000000000
Year Built
1984
Length
30.2 m (99.1 ft)
Max Span
10.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$317,000
Total Project Cost
$506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.