E1580 over CREEK
6.2 MI E OF ANTIOCH · County 049, Oklahoma · Built 1984 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
34.724675, -97.295989
This bridge is in worse condition than 77.9% of bridges in County 049. The average bridge in Oklahoma is 0 years old; this one is 42 years old.
Bridge Details
- Structure #
- 207700000000000
- Year Built
- 1984
- Length
- 22.1 m (72.5 ft)
- Max Span
- 21.3 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $267,000
- Total Project Cost
- $426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.