E1580 over CREEK

6.2 MI E OF ANTIOCH · County 049, Oklahoma · Built 1984 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 5 Fair

Location

34.724675, -97.295989

This bridge is in worse condition than 77.9% of bridges in County 049. The average bridge in Oklahoma is 0 years old; this one is 42 years old.

Nearby Bridges

Bridge Details

Structure #
207700000000000
Year Built
1984
Length
22.1 m (72.5 ft)
Max Span
21.3 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$267,000
Total Project Cost
$426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.