1670C over PECAN CREEK

7W OF GERONIMO · County 031, Oklahoma · Built 1983 · 2 Lanes · 89 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 5 Fair

Location

34.479014, -98.504878

This bridge is in worse condition than 74.6% of bridges in County 031. The average bridge in Oklahoma is 0 years old; this one is 43 years old.

Nearby Bridges

Bridge Details

Structure #
205040000000000
Year Built
1983
Length
24.4 m (80.1 ft)
Max Span
24.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
89
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$283,000
Total Project Cost
$451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.