N2080 over CREEK
N2080E1330007 · County 075, Oklahoma · Built 1983 · 2 Lanes · 100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.077817, -99.271989
This bridge is in worse condition than 33.1% of bridges in County 075. The average bridge in Oklahoma is 0 years old; this one is 43 years old.
Nearby Bridges
Bridge Details
- Structure #
- 203390000000000
- Year Built
- 1983
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.