FAS 2022 over WASHITA RIVER

1.4 MI N SH 73 · County 039, Oklahoma · Built 1982 · 2 Lanes · 400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 4 Poor

Location

35.528461, -98.993736

This bridge is in worse condition than 99% of bridges in County 039. The average bridge in Oklahoma is 0 years old; this one is 44 years old.

Nearby Bridges

Bridge Details

Structure #
202810000000000
Year Built
1982
Length
39.6 m (129.9 ft)
Max Span
15.2 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
400
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$366,000
Total Project Cost
$585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.