S.H. 152 over COBB CREEK

1.6 MI E WASHITA C/L · County 015, Oklahoma · Built 1981 · 2 Lanes · 1,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 7 Good
Substructure 7 Good

Location

35.290792, -98.594111

This bridge is in worse condition than 59.1% of bridges in County 015. The average bridge in Oklahoma is 0 years old; this one is 45 years old.

Nearby Bridges

Bridge Details

Structure #
199960000000000
Year Built
1981
Length
91.4 m (299.9 ft)
Max Span
30.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$879,000
Total Project Cost
$2,460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.