S.H. 2 over KIAMICHI RIVER

15.3 MI N JCT SH 3 · County 127, Oklahoma · Built 1977 · 2 Lanes · 690 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 5 Fair

Location

34.427078, -95.578422

This bridge is in worse condition than 88.2% of bridges in County 127. The average bridge in Oklahoma is 0 years old; this one is 49 years old.

Nearby Bridges

Bridge Details

Structure #
193630000000000
Year Built
1977
Length
183.5 m (602 ft)
Max Span
30.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
690
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,349,000
Total Project Cost
$3,777,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.