0758C over STRAIGHT CREEK

.4S OF MATOY · County 013, Oklahoma · Built 1975 · 1 Lanes · 40 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
189460000000000
Year Built
1975
Reconstructed
1993
Length
14.9 m (48.9 ft)
Max Span
14.5 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
40
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$109,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.