U.S. 270 over A OK R.R. UNDER
0.3 E JCT SH 1 · County 121, Oklahoma · Built 1974 · 2 Lanes · 4,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
34.846828, -95.537739
This bridge is in worse condition than 83% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 52 years old.
Nearby Bridges
Bridge Details
- Structure #
- 187450000000000
- Year Built
- 1974
- Length
- 51.2 m (168 ft)
- Max Span
- 16.8 m
- Width
- 13.9 m (45.6 ft)
- Lanes
- 2
- Daily Traffic
- 4,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $655,000
- Total Project Cost
- $1,833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.