N2560 over WEAVER CREEK

3. S 1.5 W WATONGA · County 011, Oklahoma · Built 1972 · 2 Lanes · 24 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
182130000000000
Year Built
1972
Length
12.2 m (40 ft)
Max Span
11.9 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
24
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$196,000
Total Project Cost
$311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.