S.H. 17A over WASHITA RIVER

0.8 MI E I-35 · County 049, Oklahoma · Built 1970 · 2 Lanes · 1,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 5 Fair

Location

34.622733, -97.19965

This bridge is in worse condition than 77.9% of bridges in County 049. The average bridge in Oklahoma is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
179560000000000
Year Built
1970
Reconstructed
2013
Length
244.8 m (803.1 ft)
Max Span
30.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,728,000
Total Project Cost
$4,839,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.