IRR E0060 over BRANCH CREEK

1.N 2E OF PEORIA · County 115, Oklahoma · Built 1938 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
176890000000000
Year Built
1938
Length
6.8 m (22.3 ft)
Max Span
6.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$139,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.