S.H. 1 NB over S.H. 19 UNDER

0.1 MI W ADA · County 123, Oklahoma · Built 1968 · 3 Lanes · 4,600 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
173210000000000
Year Built
1968
Reconstructed
2024
Length
57.9 m (190 ft)
Max Span
29.3 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
4,600
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,188,000
Total Project Cost
$3,327,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.