U.S. 64 SB over U.S. 64 UNDER

AT JCT US 64B · County 101, Oklahoma · Built 1968 · 2 Lanes · 4,050 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
172660000000000
Year Built
1968
Length
51.5 m (169 ft)
Max Span
25.9 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
4,050
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$814,000
Total Project Cost
$2,280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.