MUSKOGEE TP over CREEK

T.P NO 24.50 · County 145, Oklahoma · Built 1968 · 4 Lanes · 16,800 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
171160000000000
Year Built
1968
Length
8.8 m (28.9 ft)
Max Span
3.7 m
Width
95.1 m (312 ft)
Lanes
4
Daily Traffic
16,800
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.