OK-SH88 over SPILLWAY TO VERDIGRIS R
7.1 MI N JCT SH20 · County 131, Oklahoma · Built 1965 · 2 Lanes · 4,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
36.408333, -95.644167
This bridge is in worse condition than 61.8% of bridges in County 131. The average bridge in Oklahoma is 0 years old; this one is 61 years old.
Nearby Bridges
S.H. 88 over PSO R.R. SPUR
Built 1995
S.H. 88 over SWEET WATER CREEK
Built 1965
N4150 over SWEETWATER CREEK
Built 1930
6622C over CREEK
Built 1925
6622C over VERDIGRIS RIVER
Built 2001
E0430 over SWEETWATER CREEK
Built 1940
N4160 over CREEK
Built 1940
6622C over CREEK
Built 1925
E0433 over SWEETWATER CREEK
Built 2021
N4170 over SWEETWATER CREEK
Built 2022
Bridge Details
- Structure #
- 16639
- Year Built
- 1965
- Reconstructed
- 1989
- Length
- 190.8 m (626 ft)
- Max Span
- 43.8 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $199,000
- Total Project Cost
- $228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.