FAS 3118 over TALOKA CREEK
2.8N; .5W OF STIGLER · County 061, Oklahoma · Built 1963 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
35.296067, -95.132633
This bridge is in worse condition than 92.9% of bridges in County 061. The average bridge in Oklahoma is 0 years old; this one is 63 years old.
Nearby Bridges
E1208 over CREEK
Built 1992
N4440 over CREEK
Built 1938
N4440 over TALOKA CREEK
Built 2020
N4450 over TALOKA CREEK TRIB.
Built 1936
N4450 over TALOKA CREEK TRIB.
Built 1938
FAS 3118/ N4430 over LITTLE SANS BOIS TRIB.
Built 1939
E1206 over SNAKE CREEK TRIB.
Built 1940
N4450 over TOWN CREEK
Built 1986
E1210 (H ST.) over TOWN CREEK
Built 2009
E1210 (H ST.) over TOWN CREEK
Built 2009
Bridge Details
- Structure #
- 157740000000000
- Year Built
- 1963
- Length
- 49.1 m (161.1 ft)
- Max Span
- 19.8 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $404,000
- Total Project Cost
- $627,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.