S.H. 9 over S. CANADIAN RIVER

2.5 MI SE US69B · County 091, Oklahoma · Built 1962 · 2 Lanes · 4,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
155870000000000
Year Built
1962
Reconstructed
1986
Length
305.1 m (1001 ft)
Max Span
38.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
4,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,992,000
Total Project Cost
$11,086,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.