MISSION RD. over U.S. 62 UNDER
1.00 E JCT US-75 · County 111, Oklahoma · Built 1962 · 2 Lanes · 600 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.609964, -95.9442
This bridge is in worse condition than 65% of bridges in County 111. The average bridge in Oklahoma is 0 years old; this one is 64 years old.
Nearby Bridges
U.S. 62 over GRAVE CREEK TRIBUTARY
Built 1931
U.S. 62 over BNSF R.R. UNDER
Built 1990
U.S. 62 over CASSETAH CREEK
Built 1962
S.H. 56 LOOP over OKMULGEE CREEK TRIB.
Built 1970
E0980 over CUSSETAH CREEK
Built 1939
FAU 4356 (8 ST) over OKMULGEE CREEK
Built 1976
N3957 (MUSKOGEE ST over OKMULGEE CREEK
Built 1940
S.H. 56 over OKMULGEE CREEK
Built 1909
FAU 4348 (13 ST) over OKMULGEE CREEK
Built 2001
FAU 4340 (20 ST) over OKMULGEE CREEK
Built 1937
Bridge Details
- Structure #
- 155220000000000
- Year Built
- 1962
- Length
- 34.3 m (112.5 ft)
- Max Span
- 16.8 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $926,000
- Total Project Cost
- $2,592,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.