S.H. 18 over U.S. 270 UNDER

3.5 MI S JCT SH 3 · County 125, Oklahoma · Built 1961 · 2 Lanes · 2,550 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
153370000000000
Year Built
1961
Reconstructed
1989
Length
50.6 m (166 ft)
Max Span
16.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
2,550
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,078,000
Total Project Cost
$3,017,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.