U.S. 281 over SUGAR CREEK
6.1 N US62 ANADARKO · County 015, Oklahoma · Built 1959 · 2 Lanes · 3,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
35.159853, -98.249728
This bridge is in worse condition than 59.1% of bridges in County 015. The average bridge in Oklahoma is 0 years old; this one is 67 years old.
Nearby Bridges
IRR E1280 over CREEK
Built 1969
U.S. 281 over CAMP CREEK
Built 1959
E1270 over CREEK
Built 1982
E1290 over SUGAR CREEK
Built 1986
IRR N2670 over SUGAR CREEK
Built 1991
E1262 over CREEK
Built 2001
0830C over SUGAR CREEK
Built 1987
IRR N2680 over SUGAR CREEK
Built 2001
E1250 over CREEK
Built 1940
E1250 over CREEK OFLOW
Built 1934
Bridge Details
- Structure #
- 145030000000000
- Year Built
- 1959
- Length
- 98.1 m (321.9 ft)
- Max Span
- 12.2 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 3,400
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $908,000
- Total Project Cost
- $2,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.