5608C over R.R. UNDER
0.1 W US75 AT PRESTON · County 111, Oklahoma · Built 1954 · 2 Lanes · 800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
35.711636, -95.990239
This bridge is in worse condition than 83.3% of bridges in County 111. The average bridge in Oklahoma is 0 years old; this one is 72 years old.
Nearby Bridges
U.S. 75 SB over FLAT ROCK CREEK
Built 1989
5608C over O/P CREEK/U/P R.R.
Built 1948
5608C over CREEK
Built 1940
N3944 over FLAT ROCK CREEK
Built 1930
E0920 over CREEK
Built 2011
U.S. 75 NB over U.S. 75A / S.H. 16 UNDER
Built 2024
U.S. 75 SB over U.S. 75A / S.H. 16 UNDER
Built 2024
N3960 over CREEK
Built 1938
N3920 over FLAT ROCK CREEK
Built 1997
U.S. 75A over ADAMS CREEK
Built 1959
Bridge Details
- Structure #
- 132180000000000
- Year Built
- 1954
- Length
- 53 m (173.9 ft)
- Max Span
- 18.3 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $271,000
- Total Project Cost
- $432,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.