TURNER TP (I-44) over SLWC R.R. UNDER

12.4 MI N E JCT I-35 · County 109, Oklahoma · Built 1953 · 4 Lanes · 24,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
130300000000000
Year Built
1953
Length
33.2 m (108.9 ft)
Max Span
12.8 m
Width
24.5 m (80.4 ft)
Lanes
4
Daily Traffic
24,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$415,000
Total Project Cost
$1,196,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.